Some changes in addition to the project area can be thousands of feet away in a different part of the map, making finding the Construction Cloud Notes more difficult. Cloud Notes are placed in very busy maps making them difficult to read, not necessarily near the change. Not all designers are circling ALL NEW equipment/cables, but maybe only the CHANGED from the existing. Not all designers are clear in their cloud notes. Cloud Notes ALWAYS include the project job #.ġ. When new design is proposed, the system map is edited, white construction cloud notes are added with instructions, change circles in the color white (recently changed from the color green) are added and white leader lines from the cloud note to the circles are placed. Looking for some suggestions/ideas for showing what has been changed in a "live" as-built drawing so it is easier to QC the change and easier for construction to identify and construct per the new design.Ĭurrently: Asbuilt system maps of a telecommunications system are in continual flux of build/change.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |